serving 2012-05-24 through 2012-05-31
The following APPLICATION(S) FOR NONUSE OF WATER have been filed with the State Engineer. It is represented that additional time is needed with in which to resume the beneficial use of water in Sanpete county.
For more information or to receive a copy of filings, visit http://waterrights.utah.gov or call 1-866-882-4426.
Persons objecting to an application must file a CLEARLY READABLE protest stating FILING NUMBER, REASONS FOR OBJECTION, PROTESTANTS` NAME AND RETURN ADDRESS, and any request for a hearing.
Protest AND A $15 PROCESSING FEE MUST BE FILED with the State Engineer, Box 146300, Salt Lake City, UT 84114-6300 ON OR BEFORE JUNE 20, 2012.
These are informal proceedings as per Rule R655-6-2 of the Division of Water Rights.(The Period of Use is generally year-round except irrigation which is generally from Apr 1 to Oct 31 each year.)
NOTICE TO WATER USERS
The following APPLICATION(S) FOR NONUSE OF WATER have been filed with the State Engineer. It is represented that additional time is needed with in which to resume the beneficial use of water in Sanpete county.For more information or to receive a copy of filings, visit http://waterrights.utah.gov or call 1-866-882-4426.
Persons objecting to an application must file a CLEARLY READABLE protest stating FILING NUMBER, REASONS FOR OBJECTION, PROTESTANTS` NAME AND RETURN ADDRESS, and any request for a hearing.
Protest AND A $15 PROCESSING FEE MUST BE FILED with the State Engineer, Box 146300, Salt Lake City, UT 84114-6300 ON OR BEFORE JUNE 20, 2012.
These are informal proceedings as per Rule R655-6-2 of the Division of Water Rights.(The Period of Use is generally year-round except irrigation which is generally from Apr 1 to Oct 31 each year.)
NONUSE
51-8019 (A21239): Audrey Holt is/are seeking Nonuse period for 2.0 ac-ft. from groundwater (Indianola area) for IRRIGATION.Kent L. Jones, P.E.
STATE ENGINEER
Published in The Pyramid on May 24 and 31, 2012.
STATE ENGINEER