serving 2012-03-01 through 2012-03-08
The State Engineer received the following Application(s) in Sanpete County (Locations in SLB&M).
Published in The Pyramid March 1 and 8, 2012.
NOTICE TO WATER USERS
The State Engineer received the following Application(s) in Sanpete County (Locations in SLB&M).
For more information or to receive a copy of filings, visit http://waterrights.utah.gov or call 1-866-882-4426.
Persons objecting to an application must file a CLEARLY READABLE protest stating FILING NUMBER, REASONS FOR OBJECTION, PROTESTANTS` NAME AND RETURN ADDRESS, and any request for a hearing.
Protest AND A $15 PROCESSING FEE MUST BE FILED with the State Engineer, Box 146300, Salt Lake City, UT 84114-6300 ON OR BEFORE MARCH 28, 2012.
These are informal proceedings as per Rule R655-6-2 of the Division of Water Rights.
(The Period of Use is generally year-round except irrigation which is generally from Apr 1 to Oct 31 each year.)
CHANGE APPLICATION(S)
65-3782(a37918): Robert B. and Velyn Corbett, Horseshoe Irrigation Company propose(s) using 1.8 ac-ft. from groundwater (3 miles South of Spring City) for IRRIGATION; STOCKWATERING; DOMESTIC.
65-3860(a37936): Eagle Nest (Trust) propose(s) using 1.0 ac-ft. from groundwater (1 mi NE of Moroni) for IRRIGATION; DOMESTIC; OTHER: Agricultural building - based on 35 gallons of water per day = .0362 a/f/yr.
Kent L. Jones, P.E.
STATE ENGINEER
Published in The Pyramid March 1 and 8, 2012.
STATE ENGINEER