serving 2013-07-05 through 2013-07-16
ADVERTISEMENT FOR BID 2013 2700 NORTH SAFE SIDEWALK PROJECT FARR WEST CITY CORPORATION RECEIPTS OF BIDS: Sealed bids will be received at the office of Jones and Associates Consulting Engineers, 1716 East 5600 South, South Ogden, Utah until 2:00 p.m. on July 23, 2013, for the FARR WEST CITY 2013 - 2700 NORTH SAFE SIDEWALK PROJECT. DESCRIPTION OF WORK: The work consist of installing approximately 400 feet of 18 " RCP, 40 feet of 15 " RCP, and 88 feet of 12 " RCP storm drain pipe, two inlet boxes, approx. 4,600 tons of 3 " minus granular import fill, 1,777 l.f. of 6 ' wide sidewalk constructed next to the curb, 1,777 l.f. of 30 " curb & gutter, remove 1,348 s.f. of concrete flatwork, 1,000 s.f. of 4 " thick concrete flatwork for driveways,1,500 ton of Udot gradation Untreated Base Course, construct 1,500 s.f. of 2 ' to 4 ' high rock retaining wall, 100 c.y of topsoil, and 2,500 s.f. of sod. LOCATION OF WORK: The work is located on the south side of 2700 North Street between the Willard Canal and 2000 West in Farr West City. COMPLETION OF THE WORK: All work covered by the contract documents shall be completed by November 15, 2013. OPENING OF BIDS: The bids will be publicly opened at 2:00 p.m. on July 23, 2013 at the above mentioned office of the City Engineer, Jones and Associates Consulting Engineers, 1716 East 5600 South, South Ogden, Utah. OBTAINING CONTRACT DOCUMENTS: Contract Documents, including Drawings and Technical Specifications, may be obtained at the office of the Engineer, Jones and Associates, 1716 East 5600 South, South Ogden, Utah; upon application and payment of a $30.00 non-refundable fee. Plans will be available after Monday July 8th, 2013. BID SECURITY: Each bid shall be accompanied by a certified check, cashier 's check or bid bond in the amount of five percent (5%) of the total bid price payable to FARR WEST CITY CORPORATION as a guarantee that the bidder, if his bid is accepted, will promptly execute the Contract, secure payment of worker 's compensation insurance and furnish a satisfactory, faithful performance bond in the amount of one hundred percent (100%) of the contract price, and a payment bond in the amount of one hundred (100%) of the contract price. WAITING PERIOD BEFORE AWARD: A waiting period of 30 calendar days from the date of opening of bids to award of contract may be required. Bidder 's shall assume full responsibility for and shall guarantee the bid price during this period and make certain the time period is stated in and does not restrict the proposal guarantee. PROJECT ADMINISTRATION: All questions relative to this project prior to the opening of bids, shall be directed to the Project Engineer. It shall be understood, however, that no specification interpretations will be made by telephone, nor will any "or equal " products be considered for approval prior to award of contract. OWNER 'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids, to waive an informality in a bid, and to make awards in the interest of the Owner. Dated this 2nd day of July, 2013. By: Lindsay Afuvai, City Recorder Farr West City Corporation Pub.: July 5, 11, 16, 2013. 525988
ADVERTISEMENT FOR BID 2013 2700 NORTH SAFE SIDEWALK PROJECT FARR WEST CITY CORPORATION RECEIPTS OF BIDS: Sealed bids will be received at the office of Jones and Associates Consulting Engineers, 1716 East 5600 South, South Ogden, Utah until 2:00 p.m. on July 23, 2013, for the FARR WEST CITY 2013 - 2700 NORTH SAFE SIDEWALK PROJECT. DESCRIPTION OF WORK: The work consist of installing approximately 400 feet of 18 " RCP, 40 feet of 15 " RCP, and 88 feet of 12 " RCP storm drain pipe, two inlet boxes, approx. 4,600 tons of 3 " minus granular import fill, 1,777 l.f. of 6 ' wide sidewalk constructed next to the curb, 1,777 l.f. of 30 " curb & gutter, remove 1,348 s.f. of concrete flatwork, 1,000 s.f. of 4 " thick concrete flatwork for driveways,1,500 ton of Udot gradation Untreated Base Course, construct 1,500 s.f. of 2 ' to 4 ' high rock retaining wall, 100 c.y of topsoil, and 2,500 s.f. of sod. LOCATION OF WORK: The work is located on the south side of 2700 North Street between the Willard Canal and 2000 West in Farr West City. COMPLETION OF THE WORK: All work covered by the contract documents shall be completed by November 15, 2013. OPENING OF BIDS: The bids will be publicly opened at 2:00 p.m. on July 23, 2013 at the above mentioned office of the City Engineer, Jones and Associates Consulting Engineers, 1716 East 5600 South, South Ogden, Utah. OBTAINING CONTRACT DOCUMENTS: Contract Documents, including Drawings and Technical Specifications, may be obtained at the office of the Engineer, Jones and Associates, 1716 East 5600 South, South Ogden, Utah; upon application and payment of a $30.00 non-refundable fee. Plans will be available after Monday July 8th, 2013. BID SECURITY: Each bid shall be accompanied by a certified check, cashier 's check or bid bond in the amount of five percent (5%) of the total bid price payable to FARR WEST CITY CORPORATION as a guarantee that the bidder, if his bid is accepted, will promptly execute the Contract, secure payment of worker 's compensation insurance and furnish a satisfactory, faithful performance bond in the amount of one hundred percent (100%) of the contract price, and a payment bond in the amount of one hundred (100%) of the contract price. WAITING PERIOD BEFORE AWARD: A waiting period of 30 calendar days from the date of opening of bids to award of contract may be required. Bidder 's shall assume full responsibility for and shall guarantee the bid price during this period and make certain the time period is stated in and does not restrict the proposal guarantee. PROJECT ADMINISTRATION: All questions relative to this project prior to the opening of bids, shall be directed to the Project Engineer. It shall be understood, however, that no specification interpretations will be made by telephone, nor will any "or equal " products be considered for approval prior to award of contract. OWNER 'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids, to waive an informality in a bid, and to make awards in the interest of the Owner. Dated this 2nd day of July, 2013. By: Lindsay Afuvai, City Recorder Farr West City Corporation Pub.: July 5, 11, 16, 2013. 525988