serving 2012-08-26 through 2012-09-09
ADVERTISEMENT FOR BID LAYTON CITY CORPORATION will accept separate sealed bids for "THE FORT LANE FIRE TRAINING FACILITY PROJECT, Project 12-58. " The project includes construction of 30,000 sq. ft. of 6 " concrete driveway; 225 lf of curb & gutter and sidewalk, 4,600 sf of subgrade, roadbase and asphalt; installation of 480 lf of water, 460 lf of storm drain pipe, fencing, landscaping, lighting; and other associated items. Engineers Estimate - $500,000.00 The bids will be accepted until 2:00 p.m. local time on Tuesday, September 11, 2012 at the office of the Layton City Engineer. The bidder will be required to furnish a 5% bid bond. The bid will be awarded to the lowest responsible and responsive bidder. The City reserves the right to reject any and all bids. The bid documents may be purchased upon payment of $60.00 (non-refundable) on August 28, 2012 at the Layton City Center Building, Lower Level, in the office of the City Engineer, located at 437 North Wasatch Drive. Dated - August 8, 2012 Terry Coburn, Public Works Director Pub.: August 26, September 2, 9, 2012. 498748
ADVERTISEMENT FOR BID LAYTON CITY CORPORATION will accept separate sealed bids for "THE FORT LANE FIRE TRAINING FACILITY PROJECT, Project 12-58. " The project includes construction of 30,000 sq. ft. of 6 " concrete driveway; 225 lf of curb & gutter and sidewalk, 4,600 sf of subgrade, roadbase and asphalt; installation of 480 lf of water, 460 lf of storm drain pipe, fencing, landscaping, lighting; and other associated items. Engineers Estimate - $500,000.00 The bids will be accepted until 2:00 p.m. local time on Tuesday, September 11, 2012 at the office of the Layton City Engineer. The bidder will be required to furnish a 5% bid bond. The bid will be awarded to the lowest responsible and responsive bidder. The City reserves the right to reject any and all bids. The bid documents may be purchased upon payment of $60.00 (non-refundable) on August 28, 2012 at the Layton City Center Building, Lower Level, in the office of the City Engineer, located at 437 North Wasatch Drive. Dated - August 8, 2012 Terry Coburn, Public Works Director Pub.: August 26, September 2, 9, 2012. 498748